Perth Metro Water Reticulation Renewal
Renewed Approximately 9,750m of Reticulation Main, Ranging from DN100 to DN250.
Replaced Existing Mains with PVC-M and HSCR HDPE Pipe.
Transferred Residential and Fire Services onto the New Mains.
Replaced Hydrants and Completed Tie-Ins to Existing Infrastructure.
Hascon Civil renewed approximately 9,750 metres of reticulation main across Packages 5 and 6, ranging from DN100 to DN250, replacing the existing network with a combination of PVC-M and HSCR HDPE pipe positioned on precise alignment to suit the surrounding infrastructure. Beyond the pipe replacement itself, the scope required transferring every residential and fire service onto the new mains without disrupting supply, alongside hydrant replacements and tie-ins back into the existing network at multiple connection points.
It's the kind of project that tests coordination as much as installation, managing thousands of individual service connections across a live residential network, and reflects Hascon Civil's capacity to deliver reticulation renewal at scale.
Project Gallery